Sprache/Language:
  • Deutsch
  • English
You are here: Home arrow Quality

Quality Print E-mail
big image
before after

After press-driving a pile, it can be immediately established what load this can carry on a permanent basis. To check the outer load-bearing capacity of the pile, settlement tests and, in particular cases, proof load testing to DIN 1054 are also performed.

 

Result

The inner load-bearing capacity of the pile is guaranteed by means of hydraulic pressure testing at regular intervals on piles taken from a production batch. With pressure testing, random pile samples are tested to failure point. The permitted load is then determined by the inclusion of a safety factor. The result of the pressure test is illustrated as a load /compression curve.

 

Our construction sites are monitored by an independent health and safety engineering office.

 
www.erkapfahl.de © 2009 .::. Design visions21/Hasenbeck